Fire Rebuild & Reconstruction in Malibu
Malibu fire rebuilds: what the old house can pass on, what today's code still asks, the City of Malibu permit path and a roof built for embers.
Does keeping the old footprint excuse the new house from today's code? It is a fair question on a burned Malibu lot, and the answer is no. Size and placement may carry over under the City of Malibu's permit path, while the structure, the energy rules and, on a mapped parcel, the wildfire chapter all apply to the new work. We walk the lot, gather the old records and show where the two meet.
What the old house can pass on
Old permits, surveys and plans help show the size, height and location of the house that burned. Those records can shape what the city allows on the lot. The new structure is engineered to current loads, with foundations designed for the soil a geotechnical report describes. Energy rules apply to the new walls, roof and windows. Where the state has mapped a Malibu parcel for fire hazard, every exterior surface of the new house must hold up to embers under the wildfire chapter.
Roof and vents for embers and damp air
On a Malibu rebuild we favor a Class A roof of concrete tile or coated metal with closed ridge and eave ends, so embers cannot lodge in the gaps. Attic ventilation uses listed ember resistant vents with corrosion resistant internals. Flashing at walls and valleys is a coated or stainless sheet chosen for damp ocean air. Some lots also sit in the Coastal Zone, which may add a coastal review, and we check that before the roof design is set.
About our Fire Rebuild & Reconstruction serviceServices in Malibu
Fire Rebuild & Reconstruction in Malibu: common questions
It depends on what still stands. A house that kept its frame and a sound foundation can be repaired, with rated parts replacing what comes out. A house that is gone, or whose structure failed, is rebuilt on the lot. We give you the answer, and the permit path that goes with it, in writing.
Yes, against two yardsticks: our own scope, and what the City of Malibu and the wildfire chapter will ask for. Geotechnical work, engineering to current loads, rated roofing and corrosion resistant flashing are items to check. Each gap is noted on its line, and the copy goes to you for the carrier.
A Malibu parcel in a mapped fire hazard severity zone must be rebuilt to the wildfire chapter, which reaches vents, the roof, enclosed eaves, glazing with a tempered pane, siding and decks. We look up your lot on the state map before drawings begin and confirm what the city adds.
Fire Rebuild & Reconstruction in other cities
More work we do in Malibu
Plan your project in Malibu
Tell us about the house and the fire rebuild & reconstruction work. We reply about a walk-through and a written scope.

