New Homes Built to the Wildfire Code from the Slab Up

Ground-up houses on empty or cleared lots, with every exterior assembly chosen for fire country before framing starts.

Describe the house and the work

By sending, you agree Fernhill Builders may contact you by call, automated text or email about your request. Consent isn't required to buy. Msg & data rates may apply; reply STOP to opt out. Privacy Policy

Design the exterior first

On a new house it costs little to get the outside right from the start: enclosed eaves, rated vents, noncombustible siding, tempered glazing and a roof edge with no gaps. We set those choices with the designer before the drawings are final.

From plans to framing

We coordinate the architect, structural engineer and energy consultant, file for permit and build the foundation and frame. Inspections are scheduled as each stage closes.

Around the house

The ground within five feet of the walls is part of the plan: hardscape, gravel or other noncombustible surfaces, and no wood fence attached to the house. We build those edges as part of the job.

New Construction: questions