Embers settle the order of work on a Porter Ranch wall: openings first, covering last. A share of Porter Ranch falls on the fire hazard map, so vents, eaves and trim are dealt with before any plaster or siding goes up, since each is an entry point the finished wall would otherwise hide. Fernhill Builders writes the scope in that sequence.

Openings before cladding

Attic and foundation vents are swapped for ones with fine noncombustible mesh. Open rafter bays are boxed in, and the roof-to-wall junction is checked for gaps. Window and door flashing is renewed so it ties into the paper. Wood trim that touches the ground is cut back or replaced with a material the code accepts. Doing this first means the wall covering seals over finished details and never has to be cut open again. Each swapped part is listed by type in the scope.

Covering and base last

Once the entry points are closed, the chosen build goes on: plaster over metal lath, fiber cement boards, or another accepted wall. A metal screed sets the base of plaster work clear of soil, with a slot for drainage. A strip along the foundation is kept free of plants and mulch. The final walk looks at each vent, eave and trim joint again, since those are the places an ember would try first. Photos of each closed point go in the file.

About our Stucco & Exterior serviceServices in Porter Ranch

Stucco & Exterior in Porter Ranch: common questions

Plan your project in Porter Ranch

Tell us about the house and the stucco & exterior work. We reply about a walk-through and a written scope.