ADU Construction in Torrance, Under the Roof Panels

Torrance ADUs with metal roofing over a self-adhered underlayment, aluminum gutters and downspouts that move rain off the roof and away from the slab.

Describe the house and the work

By sending, you agree Fernhill Builders may contact you by call, automated text or email about your request. Consent isn't required to buy. Msg & data rates may apply; reply STOP to opt out. Privacy Policy

Under the metal panels of a Torrance ADU roof sits a self-adhered underlayment that seals around every fastener driven through it. If wind ever drives rain under a panel lap, that layer stops it at the deck. Above it, the panels shed water to the eaves fast, and their Class A rating means a burning ember landing there finds nothing to catch. The roof's job is to get every drop off quickly and keep sparks out.

Detailing the edges

Water finds its way in at edges and transitions, so those are detailed with care. At the eaves, a metal drip edge laps over the underlayment and directs runoff into the gutter. Where the roof meets a wall, step flashing tucks under the siding and a kick-out at the bottom steers water into the gutter, keeping it off the wall below. Valleys, if the roof has any, get a wide metal liner. Ridge and hip closures are vented only through listed ember-resistant products, or the attic is sealed and needs no vents at all.

Getting rain away from the unit

Gutters are aluminum, which holds up near the water where painted steel can rust, and they slope toward downspouts at the corners. Each downspout connects to a solid pipe buried a short way below grade that carries the water to a dry well, a curb outlet or a planted area that can take it, depending on what the city allows and how the lot drains. Around the slab, the ground is graded to fall away from the walls, so water that splashes off a gutter in heavy rain still moves outward.

About our ADU Construction serviceServices in Torrance

ADU Construction in Torrance: common questions

Plan your project in Torrance

Tell us about the house and the adu construction work. We reply about a walk-through and a written scope.