ADU Construction in Pacific Palisades

Pacific Palisades ADUs trimmed in powder-coated aluminum, with ember-resistant vents and glazing and permit drawings from Fernhill Builders.

Describe the house and the work

By sending, you agree Fernhill Builders may contact you by call, automated text or email about your request. Consent isn't required to buy. Msg & data rates may apply; reply STOP to opt out. Privacy Policy

Powder-coated aluminum covers the gutters, fascia and trim of a Pacific Palisades ADU for two reasons. It does not burn when an ember lands on it, and it does not rust the way bare steel does where marine air reaches the lot. A baked color finish keeps its look without repainting, so the edge of the building stays tidy and protected at once.

A lot that may sit in two maps

A Pacific Palisades lot may be inside a mapped fire hazard zone, inside the state coastal zone, or both. The first brings ember-resistance rules, and the second may bring a separate coastal review beside the building permit. We look up both at the start and put each answer in writing. The scope then shows which approvals apply, and in which order, before any drawing is finalized or any material is ordered. Doing this first spares you from learning about a second review after the budget is set.

Vents and glass that stand up to both

Salt in the air and embers in the wind ask different things of the same openings. Vents are stainless mesh in a listed frame, which resists flame and does not corrode. Glazing is tempered dual-pane, set in aluminum-clad or fiberglass frames with stainless hardware. Weep holes stay clear and sealants are chosen for repeated wetting. The result is a wall whose openings are protected without being fragile, and a window schedule that names every product. Aluminum trim around the glass adds a final noncombustible edge.

About our ADU Construction serviceServices in Pacific Palisades

ADU Construction in Pacific Palisades: common questions

Plan your project in Pacific Palisades

Tell us about the house and the adu construction work. We reply about a walk-through and a written scope.