Structural Work in Sherman Oaks

Sherman Oaks structural repairs from Fernhill Builders, with gutters, grade and flashing planned so water stays off new beams, posts and footings.

Describe the house and the work

By sending, you agree Fernhill Builders may contact you by call, automated text or email about your request. Consent isn't required to buy. Msg & data rates may apply; reply STOP to opt out. Privacy Policy

Gutter outlets, grade at the foundation and sprinkler heads get traced on a Sherman Oaks structural plan before any beam is sized. Water that reaches framing or a footing undoes a repair slowly, so the engineer's details show where roof runoff lands and how it leaves the lot. Permit review then covers drainage along with the load path, and the inspector can check both on the same visit.

Where roof water lands

Downspouts that empty beside a footing soften the soil carrying the house, and a roof that sheds against a wall can soak the framing at that junction. For each repaired area we mark where the water arrives and extend the outlets to a point well clear of the foundation. Flashing at wall and roof meetings is renewed along with the framing, since reused metal fails first. Where a deck ledger is bolted to the house, the bolted joint gets flashing that sheds water outward over the rim, which protects the beam it hangs from.

Ground, plumbing and the sill

Ground that slopes toward the stem wall is a problem, and a planter bed or sprinkler line set against the stem wall wets the sill plate all year. Sills that touch concrete are pressure-treated or set on a barrier. Leaking supply and drain lines inside the floor are also water, and they are pressure-tested before repaired joists are closed in. If the lot has a low spot beside the house, the plan can add a drain line or a swale so the new work stays dry.

About our Structural Work serviceServices in Sherman Oaks

Structural Work in Sherman Oaks: common questions

Structural Work in other cities

Plan your project in Sherman Oaks

Tell us about the house and the structural work work. We reply about a walk-through and a written scope.